Strip of hydromulch establishing along a paddock, with young trees in guards
Sector:
Renewable Energy

Bellambi BESS

Macquarie Revegetation was engaged by A1 Earthworx to deliver approximately 50,000m² of revegetation and erosion control works across the Bellambi Battery Energy Storage System.

Client
A1 Earthworx
Location
Bellambi Battery Energy Storage System, NSW
Principal
Scope
Hydromulching, batter stabilisation and erosion control

How This Project Came Together

The Brief

Working alongside the client over several months, our scope was delivered progressively as different areas of the project became available. This meant responding to changing site conditions and applying different treatments depending on location, soil conditions and erosion risk.

What We Delivered

A custom seed blend was incorporated into the hydromulching program to suit the site's revegetation requirements. Higher-risk areas and batters received additional stabilisation treatments, while polymer applications provided immediate erosion and sediment control in areas where vegetation establishment alone wasn't suitable.

The Outcome

With around 50,000m² treated across multiple stages, Bellambi BESS demonstrates our ability to deliver more than a single hydromulching application - working closely with A1 Earthworx throughout the construction program to provide practical solutions as requirements developed, from large-scale revegetation through to targeted batter stabilisation and erosion control.